Replacing a framed shower door with frameless glass
Taking out an old framed door is the quick part. What matters is what it leaves behind, and the walls the new glass has to fit.

Framed, then frameless
A framed door has metal around every piece of glass and a track on the curb. Frameless glass stands on its own, at least 3/8 in thick, held by hinges and clamps or a slim channel.
Try it: show me

Taking the old door out
The track comes off the curb, the side jambs come off the walls, and the old silicone is cut away. What is left are screw holes and caulk lines in the tile. We clean them up and, where a new hinge or clamp lands on the same spot, we move it or cover it.
Sometimes the tile under an old track is a slightly different shade. We point that out at the measure so it is not a surprise.
Exaggerated for the drawing. Real walls lean far less, and the glass is still cut to the real line.
Measured for the walls you have
An old frame hides walls that lean and curbs that slope. Frameless glass hides nothing, so we measure the opening at the top, middle and bottom on both sides, and the glass is cut to your walls.
How we measurePicking the new layout
The same opening often suits more than one layout: a door and panel, a slider for a tight room, or a single panel for a walk-in. Try them on a 3D shower.
Try it: try a layout in 3D
Made once, for your opening
Every notch, hinge hole and edge is made before the glass is tempered, because tempered glass cannot be cut afterwards. That is why the final numbers come from our measure.
Short answers
Can you replace my framed door with frameless glass?
Yes. We remove the old frame and track, clean up the wall and curb, and measure for new frameless glass.
Will I see where the old frame was?
Sometimes. Screw holes and caulk lines are cleaned up, and a new hinge or clamp that lands on an old spot is moved or covers it. Tile under an old track can be a slightly different shade, and we point that out at the measure.
Get a free quote
Anything you tried on this page goes with it as your design. Or open it in the 3D studio first.












